Please wait

Stalled 366m stretch of Kolkata metro’s New Garia–Airport line set for November restart

  • Kolkata metro orange line work at Chingrighata to resume mid-November after five-hour meeting under court directive
  • RVNL to conduct work on November 14-16 and 21-23 with weekend traffic blocks to reduce public inconvenience
  • Only 366m stretch pending at chingrighata while most of New Garia–Airport metro project already completed

15 Sep 2025

Stalled 366m stretch of Kolkata metro’s New Garia–Airport line set for November restart

The long-stalled work of Kolkata Metro’s Orange Line, connecting Kavi Subhash to the Airport, is finally set to move forward. The construction at Chingrighata, where progress had been stuck for months, will resume from mid-November following a crucial directive from the Kolkata High Court.

A nearly five-hour meeting at Metro Bhavan brought all parties to a consensus on how to proceed with the pending work. It was decided that traffic blocks would be imposed only on weekends to minimize disruption. RVNL will carry out construction activities on November 14, 15, 16 and again on November 21, 22, 23.

Most of the New Garia–Airport Metro project has already been completed, leaving only a 366-meter stretch at Chingrighata pending. Authorities are hopeful that with this breakthrough, the long-awaited line will move closer to full operational readiness.

The decision marks a significant relief for commuters and project planners alike, as the Orange Line is considered a critical metro corridor for Kolkata.

Ad Image
Comments

No comments to show. Log in to add some!

Other Relevant Stories


Stalled 366m stretch of Kolkata metro’s New Garia–Airport li
Kolkata metro orange line work at Chingrighata to resume mid-November after five-hour meeting under court directive RVNL to conduct work on November 14-16 and 2





Download The Taaza Tv App Now to Stay Updated on the Latest News!


play store download
app store download
app img


Breaking News